PRE-BUILT HOUSES - model TP.01

Preview of a pre-built housing, T4-2 floors. Model TP.01-T4-2P
Optional:
Photovoltaic electric power for self consumption.
Heating reinforcement of domestic water, through solar thermal panels.
- Self-treatment of sewage and waste water, (under analysis).
Indoor air conditioning / heating through solar thermal panels (heating) and, Hydro-geothermal (Cooling - under condition)

Deadline for infrastructures: 45 days. On-Site Assembly Deadline (Continental Portugal) and finishes: 30/45 days

Excluded from the deadlines: Licensing, swimming pool, peripheral walls, and eventual excavation and peripheral containment, as well as the exterior landscape arrangements.

Visualização de um moradia Pré-fabricada,T4-2 pisos. Model TP.01-T4-2P
Opcionais:
- Energia eléctrica fotovoltaica para autoconsumo.
- Aquecimento reforço de águas da rede doméstica, através de painéis solares térmicos.
- Auto-tratamento de esgotos e águas residuais, (sob análise).
- Climatização interior refrigeração/aquecimento interior, atraves de paineis solar térmicos (aquecimento) e, Hidro-geotermico (Arrefecimento - sob condição) Prazo de execução infraestruturas: 45 dias - Prazo de Montagem no local, (Portugal Continental) e acabamentos: 30/45 dias

Excluídos dos prazos: Licenciamentos, piscina, muros periféricos, e eventual escavação e contenção periférica, assim como os arranjos exteriores paisagísticos.